MILESTONES

Alpex 1993 - till date

1993-98
  • Inception of the company
  • Launch of Spandex Yarn
  • Commencement of International Trading Operations
1999
  • Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
2000-01
  • Operations further expanded by increasing product offerings.
  • Opening of multiple remote offices to cater to an ever growing demand.
2002-04
  • Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
2005
  • Venture into Renewable Energy
  • Installation of Wind Turbine in Tamil Nadu
2007
  • Establishment of a new 20MW capacity automated line for Solar PV Module manufacturing in Himachal Pradesh, India. The line was commissioned by Spire Corporation, USA
2012
  • Opening of 3 additional remote offices.
  • Module manufacturing capacity up to 75MW.
  • Installation of 250 AC/DC water pumps in Rajasthan.
  • Company ventures into RESCO
2014-15
  • Turnover crossed ₹100 Cr.
  • Second facility at Greater Noida operational.
  • Capacity increased to 150MW
2017-18
  • Commissioning of 5the line in Greater Noida facility
  • Production capacity up to 1GW in works.
  • Crossed ₹395 Cr. turnover
2019-21
  • Factory space expanded by 3000 sq meters.
  • ALMM Approval
  • New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.
2022-24
  • Capacity expansion to 1.2 GW and production of N type Topcon panels.
  • Listed on NSE
  • Procured land for third factory
1993
  • Inception of the company
  • Launch of Spandex Yarn
  • Commencement of International Trading Operations
1999
  • Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
2000-01
  • Opening of multiple remote offices
  • Operations further expanded by increasing product offerings. offices to cater to an ever growing demand.
2002-04
  • Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
2005
  • Venture into Renewable Energy
  • Installation of Wind Turbine in Tamil Nadu
2006
  • Integration of all offices by a world class Navision ERP System
  • Installation of second Wind Turbine in Tamil Nadu
2007
  • Establishment of a new 20MW capacity automated line for Solar PV Module manufacturing in Himachal Pradesh, India. The line was commissioned by Spire Corporation, USA
2011
  • Commissioning of second line
  • Plant capacity becomes 450MW
2012
  • Opening of branches in Patna, Jaipur, UP
  • Solar PV expansion capacity up to 75MW
  • Installed first batch of 250 solar powered pumps in Rajasthan
  • Company ventures into RESCO
2014-15
  • Turnover crossed 100 Cr.
  • Second unit at Greater Noida operational
  • Capacity increased to 150MW
2017-18
  • Commissioning of 5th line in Greater Noida factory
  • Production capacity to be expanded to 1GW in work
  • Crossed ₹395 Cr. turnover
2019-21
  • Factory space expanded by 3000 sq meters.
  • ALMM Approved
  • New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.
2022-24
  • Capacity expansion to 1.2 GW and production of N type Topcon panels.
  • Listed on NSE
  • Procured land for third factory
milestone images
8 Industry Centric Locations
milestone images
Production Capacity 450 MW
milestone images
516293 KWh/day Electricity Generated
milestone images
8 Industry Centric Locations
milestone images
Production Capacity 450 MW
milestone images
516293 KWh/day Electricity Generated

This website uses cookies

We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services.