MILESTONES
Alpex 1997 - till date
-
Inception of the company
- Launch of Spandex Yarn
- Commencement of International Trading Operations
-
Opening of Ludhiana and Tirupur branches
-
Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
-
Opening of Mumbai branch
-
Operations further expanded by launch of other speciality yarns
-
Staff strength to 30 people
-
Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
-
Venture into Renewable Energy
-
Installation of first Wind Turbine in Tamil Nadu
-
Integration of all offices by a world class Navision ERP System
-
Installation of second Wind Turbine in Tamil Nadu
-
Setting up of an automatic line, in Himachal Pradesh for manufacturing Solar PV panels
-
Commissioning of a state-of-the art line from Spire Corporation USA
-
Manufacturing of Solar PV panels
- Team strength up to 150.
-
Commissioning of second line
-
Opening of branches in Patna, Jaipur and UP.
-
Module manufacturing capacity up to 75MW.
-
Installation of 250 AC/DC water pumps in Rajasthan.
-
Company ventures into RESCO
-
Staff strength increased to 200
-
Turnover crossed 100 Cr.
-
Second facility at Greater Noida operational.
-
Capacity increased to 150MW
-
Integration of all branches with efficient open source ERP system
-
Manpower over 250 employees
-
Commissioning of 5the line in Greater Noida facility
-
Production capacity up to 1GW in works.
-
Factory space expanded by 3000 sq meters.
-
New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.
-
Capacity expansion to 1.2 GW and production of N type Topcon panels.
-
Inception of the company
-
Launch of Spandex Yarn
-
Commencement of International Trading Operations
-
Opening of Ludhiana and Tirupur branches
-
Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
-
Opening of Mumbai branch
-
Operations further expanded by launch of other speciality yarns
-
Staff strength to 30 people
-
Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
-
Venture into Renewable Energy
-
Installation of first Wind Turbine in Tamil Nadu
-
Integration of all offices by a world class Navision ERP System
-
Installation of second Wind Turbine in Tamil Nadu
-
Setting up of an automatic line, in Himachal Pradesh for manufacturing Solar PV panels
-
Commissioning of a state-of-the art line from Spire Corporation USA
-
Manufacturing of Solar PV panels
-
Expansion of staff to 150 people
-
Commissioning of second line
-
Plant capacity becomes 450MW
-
Opening of branches in Patna, Jaipur, UP
-
Solar PV expansion capacity up to 75MW
-
Installed first batch of 250 solar powered pumps in Rajasthan
-
Company ventures into RESCO
-
Staff strength increased to 200
-
Turnover crossed 100 Cr.
-
Second unit at Greater Noida operational
-
Capacity increased to 150MW
-
Integration of all branches with efficient open source ERP system
-
Capacity expansion to 250MW
-
Manpower over 250 employees
-
Commissioning of 5th line in Greater Noida factory
-
Production capacity to be expanded to 1GW soon
-
Factory space expanded by 3000 sq meters.
-
New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.