MILESTONES
Alpex 1993 - till date
-
Inception of the company
- Launch of Spandex Yarn
- Commencement of International Trading Operations
-
Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
-
Operations further expanded by increasing product offerings.
-
Opening of multiple remote offices to cater to an ever growing demand.
-
Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
-
Venture into Renewable Energy
-
Installation of Wind Turbine in Tamil Nadu
-
Establishment of a new 20MW capacity automated line for Solar PV Module manufacturing in Himachal Pradesh, India. The line was commissioned by Spire Corporation, USA
-
Opening of 3 additional remote offices.
-
Module manufacturing capacity up to 75MW.
-
Installation of 250 AC/DC water pumps in Rajasthan.
-
Company ventures into RESCO
-
Turnover crossed ₹100 Cr.
-
Second facility at Greater Noida operational.
-
Capacity increased to 150MW
-
Commissioning of 5the line in Greater Noida facility
-
Production capacity up to 1GW in works.
- Crossed ₹395 Cr. turnover
-
Factory space expanded by 3000 sq meters.
- ALMM Approval
-
New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.
-
Capacity expansion to 1.2 GW and production of N type Topcon panels.
- Listed on NSE
- Procured land for third factory
-
Inception of the company
-
Launch of Spandex Yarn
-
Commencement of International Trading Operations
-
Expansion of the International Trading Operations by the launch of Samsung Knitting Components in India
-
Opening of multiple remote offices
-
Operations further expanded by increasing product offerings. offices to cater to an ever growing demand.
-
Expansion of Samsung Knitting Components by addition of flat knitting needles, socks needles and raschel needles
-
Venture into Renewable Energy
-
Installation of Wind Turbine in Tamil Nadu
-
Integration of all offices by a world class Navision ERP System
-
Installation of second Wind Turbine in Tamil Nadu
-
Establishment of a new 20MW capacity automated line for Solar PV Module manufacturing in Himachal Pradesh, India. The line was commissioned by Spire Corporation, USA
-
Commissioning of second line
-
Plant capacity becomes 450MW
-
Opening of branches in Patna, Jaipur, UP
-
Solar PV expansion capacity up to 75MW
-
Installed first batch of 250 solar powered pumps in Rajasthan
-
Company ventures into RESCO
-
Turnover crossed 100 Cr.
-
Second unit at Greater Noida operational
-
Capacity increased to 150MW
-
Commissioning of 5th line in Greater Noida factory
-
Production capacity to be expanded to 1GW in work
- Crossed ₹395 Cr. turnover
-
Factory space expanded by 3000 sq meters.
-
ALMM Approved
-
New CEO Mr Satish Gupta ex- Tata Solar Power joins to take the company to greater heights.
-
Capacity expansion to 1.2 GW and production of N type Topcon panels.
-
Listed on NSE
-
Procured land for third factory