Key Summary

  • PM Kusum Yojana is an MNRE scheme that helps farmers through solar power plants (Component A), standalone solar pumps (Component B) and solarisation of existing grid-connected pumps (Component C).

  • The Centre and state usually cover about 30% each, leaving farmers around 40% of the eligible cost. A bank loan can lower the upfront payment, but it must be repaid.

  • Solar pump prices vary by state, pump capacity and tender rate. Check your state’s approved rate card and keep Aadhaar, land records and bank proof ready before applying.

  • Applications go through state portals only. Some projects got deadline extensions into 2026-27, but fresh registration is not guaranteed, so confirm open windows and avoid fake fee-demanding websites.

The first question most farmers ask about PM Kusum Yojana is simple: kitna kharcha aayega? If the approved eligible cost of a solar pump is ₹2.5 lakh and you receive 60% assistance, your share is ₹1 lakh. This calculation applies only when the full ₹2.5 lakh qualifies for the subsidy.

The Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) supports standalone solar pumps, solarisation of existing electric pumps and eligible solar power projects. This guide explains the components, subsidy, pump costs, eligibility, documents, online registration and 2026 status. Check your state’s latest notice before applying because the available components, prices and registration dates vary.

Start Saving On Energy Bills Now!

We MANUFACTURE. We INSTALL.
No Middleman. No False Warranties.

What Is PM Kusum Yojana? (PM Kusum Yojana Kya Hai)

PM Kusum Yojana is a central government scheme implemented by the Ministry of New and Renewable Energy (MNRE). Launched in March 2019, it aims to reduce diesel use in irrigation, expand solar power in agriculture and create opportunities for farmers to earn from eligible electricity sales.

The scheme has three main uses:

  • Reduce irrigation costs: Replace eligible diesel-powered pumps with standalone solar pumps.
  • Solarise electric pumps: Use solar power to operate existing grid-connected agricultural pumps.
  • Earn from solar power: Set up eligible grid-connected solar plants or sell surplus electricity where the applicable arrangement permits it.

PM Kusum Yojana is not PM-Kisan. PM-Kisan provides income support to eligible farmers; PM-KUSUM supports solar-energy projects for agriculture. Rooftop solar for homes is covered separately under PM Surya Ghar Muft Bijli Yojana.

Read the official national PM-KUSUM portal for scheme guidelines, notices and state implementing agencies.

The Three Components (A, B, C): Which One Fits You?

Choose the component according to what you want to install. Most individual farmers looking for a new off-grid pump should check Component B. Farmers who already have an eligible grid-connected agricultural pump should check Component C.

ComponentWhat it coversBest suited forMain benefit
AGrid-connected solar power plants, generally 500 kW to 2 MW

Farmers and eligible project developers with suitable land

Sell electricity to a DISCOM under an approved arrangement
BStandalone solar agricultural pumpsFarmers needing an off-grid irrigation pumpFarmers needing an off-grid irrigation pumpOperate irrigation equipment using solar power without a grid connection
C

Solarisation of existing grid-connected agricultural pumps or feeders

Farmers with eligible electric pumps; feeder-level projects

Use solar power for irrigation; eligible surplus may be sold under applicable rules

Use this decision rule:

  •       Want to set up a solar power plant on suitable land? Check Component A.
  •       Need a new standalone solar pump in an eligible off-grid area? Check Component B.
  •       Already have an eligible grid-connected agricultural pump? Check Component C.

Component A has a different financial-assistance structure from Components B and C. Do not assume the pump subsidy applies to a solar power plant. Confirm the component and current application window with your state agency.

PM Kusum Yojana Subsidy: How Much Do You Get?

For eligible standalone pumps under the standard arrangement, central financial assistance is about 30% of the applicable benchmark cost or tender-discovered price, whichever is lower. The state or union territory provides at least another 30%, leaving around 40% for the farmer.

Who PaysStandard ArrangementNE / hilly / island regions
Central governmentAbout 30%About 50%
State/UT governmentAt least 30%At least 30%
Farmer/beneficiaryAbout 40%About 20%

The higher central share applies to specified regions, including northeastern states, Sikkim, Jammu and Kashmir, Ladakh, Himachal Pradesh, Uttarakhand, Lakshadweep and the Andaman and Nicobar Islands. Check the current guidelines for your location.

The standard split is not universal. Official scheme information states that Components B and C (individual pump solarisation) can also be implemented without the state’s 30% share. In that case, central assistance remains 30% and the farmer bears the remaining 70%. Confirm the actual arrangement with your implementing agency before budgeting.

Example: Calculate the Farmer’s Share

Suppose the approved eligible cost is ₹2,50,000 and central and state assistance both apply at 30%:

  •       Central assistance: ₹75,000.
  •       State assistance: ₹75,000.
  •       Farmer’s share: ₹1,00,000.

If the approved benchmark or tender price is lower than the vendor’s quoted price, the subsidy calculation may use the lower eligible amount. The farmer may have to pay the difference.

A bank loan may let a farmer pay about 10% upfront and finance part of the remaining share. For example, a 10% initial payment on an eligible cost of ₹2,50,000 is ₹25,000, while a loan covering another 30% would be ₹75,000. That ₹75,000 is repayable debt, not additional subsidy. Confirm loan approval, interest and repayment terms with the bank.

Solar Pump Cost & PM Kusum Yojana Price List

There is no single nationwide price that applies to every PM-KUSUM solar pump. The final price depends on pump capacity, pump type, technical specifications, the state’s tender and the vendor’s approved rate. A retail price alone does not tell you how much subsidy you will receive.

Use the official PM-KUSUM national portal to locate the state-wise vendor list and rate-card resources. Then check your state’s latest notice for the pump capacity and component available to you.

Pump capacityWhat to check before budgetingHow to calculate your indicative share
3 HPState-approved rate for the 3 HP pump and its specificationMultiply the eligible approved cost by your applicable farmer-share percentage
5 HPState-approved rate for the 5 HP pump and its specificationsMultiply the eligible approved cost by your applicable farmer-share percentage
7.5 HPState-approved rate for the 7.5 HP pump and its specificationsMultiply the eligible approved cost by your applicable farmer-share percentage

Example for a 5 HP pump: If the state-approved eligible cost is ₹2,50,000 and the farmer’s share is 40%, the indicative contribution is ₹1,00,000. If the state-approved cost is different, recalculate using that figure. This is an example, not a quoted 5 HP market price

How to Check Your Actual Pump Price

  1. Open the national PM-KUSUM portal.
  2. Find the state-wise vendor list or rate-card section.
  3. Open your state’s official scheme notice and select the relevant component and pump capacity.
  4. Check the approved pump rate, subsidy amount, farmer contribution, payment deadline and empanelled vendor.
  5. Ask the implementing agency to explain any difference between the vendor quotation and the eligible cost used to calculate assistance.

Under the standard pump provisions, assistance is generally calculated against the applicable benchmark or tender cost and is subject to the relevant capacity limits, commonly up to 7.5 HP. Do not assume the additional cost of a larger pump will receive the same subsidy.

Who Is Eligible + Documents Required

Eligibility depends on the component and the state’s current rules. Potential beneficiaries include individual farmers, farmer groups, Farmer Producer Organisations (FPOs), cooperatives, panchayats and Water User Associations. Component A has separate project and land requirements.

Prepare these documents before starting an application:

  •       Aadhaar and a linked mobile number, where required for verification.
  •       Land or cultivation records, such as khasra-khatauni or a 7/12 extract where applicable.
  •       Bank passbook or other accepted bank-account proof.
  •       Recent photograph.
  •       Existing agricultural electricity-connection details for Component C.
  •       Any additional state-required certificates, pump details or technical information.

Check the state application notice for its exact document list. Make sure the names and details on your identity, land and bank records match. Correct discrepancies before submitting the form.

Meeting the eligibility conditions does not guarantee approval. Selection depends on the component, available state allocation, application window and document verification.

How to Apply for PM Kusum Yojana Online Registration

Applications are handled through designated state agencies. Start at the national PM-KUSUM portal and follow the official route for your state.

  1. Choose your component. Select A for a solar power plant, B for a standalone pump or C for an eligible existing grid-connected pump.
  2. Open your state’s official portal. Use the state implementing agency listed through the national portal.
  3. Check whether registration is open. Confirm the component, district, pump capacity, application deadline and available allocation.
  4. Complete identity verification. Follow the portal’s OTP or other prescribed verification process.
  5. Enter your details. Fill in the requested personal, land, irrigation, pump and electricity-connection information.
  6. Upload the documents. Upload clear files and check every entry before submitting the form.
  7. Follow the official payment and verification process. Pay only through the method specified in the official notice. Save the application number, acknowledgement and receipt. Complete any site survey or document verification requested by the agency.

Avoid registration scams. MNRE has warned about fake websites and applications that demand registration fees or pump payments. Never transfer money to a personal bank account, private UPI ID or agent promising guaranteed selection. Wait for the official sanction or selection notice before committing to a vendor

State-Wise PM Kusum Application Portals

Use the official state route below, then check its latest notice. A working website does not mean new applications are currently being accepted.

StateOfficial application route
Madhya PradeshMPUVNL solar pump portal, check the current PM-KUSUM notice.
Uttar PradeshUP Agriculture Department portal, check the current notice.
RajasthanRRECL for Component A, check registration status and the current pump notice
MaharashtraMSEDCL (Magel Tyala Saur Krushi Pump Yojana) and MEDA portals, check the current notice.
HaryanaHAREDA online services through SARAL Haryana, check the current notice
KarnatakaKREDL, with registration through Souramitra, check the current notice.
JharkhandJharkhand PM-KUSUM portal, check availability.
PunjabPEDA, check the current notice.
OdishaOdisha PM-KUSUM portal

Jharkhand’s portal has displayed a maintenance notice affecting registration services. Check whether the service has resumed before trying to apply. For any state, use the national portal to cross-check the implementing agency and avoid third-party sites that imitate government registration pages.

PM Kusum 2.0 and 2026 Updates

The original PM-KUSUM scheme deadline was 31 March 2026. MNRE extended project completion to 31 March 2027 for projects where the power purchase agreement (PPA) was signed or the notice to proceed (NTP) was issued on or before 31 December 2025. Industry reporting on the same order states that the 2027 date covers Component A and feeder-level Component C projects, while commissioning for Component B pumps and individually solarised Component C pumps was set at 30 September 2026. This extension applies to qualifying projects already in the pipeline; it does not automatically reopen fresh farmer applications.

In October 2026, industry reporting stated that financial closure for eligible Component A and Component C projects had been extended to 30 November 2026. This is a project-financing deadline, not a nationwide solar-pump registration deadline. Check the official national portal for the relevant MNRE notice and conditions.

Punjab’s implementing agency, PEDA, states that MNRE closed PM-KUSUM 1.0 with effect from 31 December 2025, and that Punjab’s new allocation will be sanctioned after PM-KUSUM 2.0 launches. PM-KUSUM 2.0 has been discussed as a proposed next phase. Check for a formal government notification before relying on any claimed launch date, new subsidy amount or application process.

Before applying, confirm that your state is accepting applications for your component and district. A project extension does not itself create a new application window.

Things to Check Before You Apply (Limitations)

  • Check the current application window: The state may stop accepting applications when its allocation is filled.
  • Confirm the subsidy calculation: Assistance depends on the applicable benchmark or tender cost and the state’s contribution.
  • Choose the correct component: Component B is for standalone off-grid pumps; surplus electricity sales should not be assumed under this component.
  • Check pump suitability: Ask the implementing agency or approved technical provider to confirm that the pump suits your borewell depth, water yield and irrigation requirements.
  • Get payment terms in writing: Confirm your contribution, any loan, the approved vendor and the official payment method before paying.

Conclusion

PM Kusum Yojana can lower the cost of solar irrigation, but your actual contribution depends on the approved pump price, applicable subsidy and state rules. Check the official rate card and current registration notice, calculate your share from the eligible cost, and keep your application acknowledgement and payment receipt

Alpex Solar has supplied and installed solar pumps under PM-KUSUM for state agencies in Haryana, Jharkhand and Maharashtra.

FREE SOLAR EXPERT CONSULTATION

Frequently Asked Questions

There is no single nationwide price for a 5 HP pump under the scheme. Find the approved 5 HP rate in your state’s vendor list or rate card. If the eligible approved cost is ₹2,50,000 and your share is 40%, your indicative contribution is ₹1,00,000. Your actual amount may differ.

Under the standard arrangement for eligible pumps, central assistance is about 30% and state assistance is at least 30%, leaving around 40% for the farmer. Specified northeastern, hilly and island regions may receive 50% central assistance. Components B and C may also be implemented without the state share, in which case the farmer may bear the remaining 70%

Fresh registration is not guaranteed nationwide. Check your state’s official portal for an open application notice. Extensions for eligible existing projects do not automatically mean farmers can submit new applications.

A farmer with an eligible grid-connected agricultural pump may qualify under Component C. Component B is for a standalone pump in an eligible off-grid area. Confirm your pump’s eligibility and your state’s current registration window before applying.

Start at the official national PM-KUSUM portal to find state-wise vendor and rate-card resources and identify your state’s implementing agency. Use the state’s official website to confirm the current price, application window, required documents and payment instructions.

Author : Gaurav Bector

Gaurav Bector, Vice President of the EPC division at Alpex Solar, is an Electrical Engineer with 32+ years of experience in the energy sector. He has led business development in smart energy systems, grid automation, and green solutions with top firms like ABB, Siemens, and Alstom. With global expertise across Europe, South Asia, and the Middle East, Gaurav excels in leadership, operations, sales, engineering, and project management.